
Basements · Barrhaven
A bare basement turned family room
- Area
- Barrhaven
- Service
- Basement finishing
- On site
- 9 weeks
- Budget range
- $60,000 to $70,000
- Finished
- 2024
The brief
This family needed a second living room for three teenagers. The basement was dry but cold, with bare concrete and ducts running under the joists.
What we did
- A moisture check came back clean, so we went straight to rigid insulation and framing.
- We moved two duct runs to one side and boxed them tightly. That kept the full ceiling height over the main seating area.
- A built-in oak media wall and a wet bar with a bar fridge finish the room. Vinyl plank floors sit on an insulated subfloor.
The result
The basement is now the warmest room in the house in winter. We finished a week ahead of schedule.
Scope of work
- Moisture check and insulation
- Framing, drywall and flush lighting
- Built-in oak media wall
- Wet bar with plumbing
- Insulated subfloor and vinyl plank
Before and after
The same room, 9 weeks apart.
Drag the line, or focus the photo and use the arrow keys, to compare.


Start with a free visit
Planning something similar?
We visit and measure. A written fixed-price quote follows within a week, with every allowance spelled out.


